Done Vessel
ALAMEDA
NAME:
|
ALAMEDA |
TYPE:
|
BULK CARRIER |
TEU:
|
25768 |
Description:
|
TYPE OF VESSEL:BULK CARRIER, NAME OF VESSEL:ALAMEDA DIMENSIONS: L.O.A:190.00 M,BREADTH: 32.00 M, DEPTH:16.30 M , S.DRAUGHT:11.624 M. REPAIR CHARACTERISTIC: SPECIAL SURVEY WORKING PERIOD :13TH JUN 2010 TO 20TH JUL 2010. MAIN REPAIRING PROJECT: NO.1-5 C/H HAVE SANDED BLASTING AND PAINTED ,NO.3、4、5 HACTH COVERS HAVE SANDED BLASTING AND PAINTED,FPT、APT AND 2 WATER TANKS HAVE CLEANED、CHIPPED AND PAINTED.SKY-LIGHTS ON FORCASTLE HAVE DONE REINFORCED,SHELL JONT IN NO.1-5 TST AND C/H HAVE REPIARED,ZINC ANODES IN BALLAST TANKS HAVE RENEWED.A/C IN ACCO. BOTTOM PLATE HAVE RENEWED,DRAIN PIPES IN ACCO. VOID SPACE HAVE UNBLOCKED, ACCO. VENT HEADS HAVE OPENED AND INSPECTED, ALL C/H VENTILATIONS HAVE OVERHAULED,POOP DECK HYDRALIC MOTORS HAVE REMOVED IN ORDER AND CHANGED THE FOUNDATIONS. VENTS IN E/R HAVE OVERHAULED ,MOTORS HAVE MAINTAINED,LIFE BOATS AND DAVITS HAVE DONE 5 YEARS INSPECTION, POSTS OF CRANE HAVE CHIPPED AND PAINTED,DECK CRANES HAVE REPAIRED,NO.3 C/H VENTS HAVE CHANGED TO NO.4 C/H ,ACCO. LADDERS (2 PCS) HAVE OVERHAULED AND DONE LOAD TEST.GENERATORS(3 SETS ) HAVE MAINTAINED ON SPOT,ELEC MOTORS (24 PCS) HAVE TOOK TO WORKSHOP DONE GENERAL MAINTAINED ,MOTORS(2 PCS) HAVE REWINDED,COUPLING OF BIGLE PUMP HAVE CHANGED,ACCO.LIGHT FOUNDATIONS HAVE RENEWED,SOME LIGHTS HAVE REPLACED .HEAT EXCHANGERS HAVE DONE GENERAL CHEMICAL CLEANED, M/E GOVERNOR AND TC HAVE DONE GENERAL MAINTAINED,TAIL SHAFT HAVE INSPECTED AND MEASURED ETC. |
Port of registry:
|
IRAN |
Done Vessel
- NAME
- Brief Introduction
- DETAIL
Zhoushan Xinya Shipyard Co., Ltd
MESSAGES
Hotline
Add. :Donglangzui, Liuheng Town, Putuo District, Zhoushan City, Zhejiang Province,China
Website:http://www.xinyashipyard.com
Copyright © 2020 Zhoushan Xinya Shipyard Co., Ltd All right reserved.
© Zhoushan Xinya Shipyard Co., Ltd